Fleming Remodel

Date: 2013
Location: Waterford, Tyler, Texas
Client : Fleming
Design Team: Studio B Designs
Contractor: Riley Harris Construction
Scope of Work: Master Bath & Powder Room Remodel
Category: Home

The Master bath needed updating but the floor plan remained the same.

Our Solution:

We left only the linen cabinet and put in all new finishes and fixtures in the Master. The tub and tile in the powder room remained but we replaced the vanity and wallpapered.